PROJECT NAME:Changshu Thermal Power Plant 3×600 MW FGD Prject
M/S:Wuhan Kaidi Electric Power Co.,Ltd.
BRIEF INTRODUCTION:Oxidation Air Blowers in This FGD System Project Supply Oxidation for Absorption Tower to react with SO2.
BLOWER PARAMETER: TYPE:IRS-300CJ CAPACITY:6,248Nm3/h PRESSURE(G):121 kPa MAX SUC.TEMP.:39℃

HIGHEST

PRINCIPALPART

LOOK DOWN
|